Parsons Downtown Improvements Show Details

Location
Parsons, Tennessee
Project Type
Transportation Alternatives (TA) Grant Funded
Description

  • Project Details:

TLM Associates, Inc. was retained to provide preliminary engineering report, pre-design cost estimating, design, construction administration, construction observation, and closeout for this project, which has now become a four-phase renovation project. TLM has provided services for all three phases. TLM provided the technical assistance required during the submission of the multiple grant applications utilized to fund the projects, construction oversight and administration of the project throughout the grant processes. The completion of the downtown enhancement project extended eight blocks in the core downtown area of Parsons and the south entrance into town. Phase I and II Parsons Downtown Enhancements were part of a multi-phased project directed by a City Beatification Committee to enhance the downtown business area of Parsons. The improvements include a revitalized theme of pedestrian lighting, sidewalks, street trees, and plantings. The sidewalks provide an ADA compliant connection between Downtown and the adjoining commercial businesses, churches, the Parsons Municipal Building, and residential areas south of town. Landscape design was provided by Ritchie Smith Associates.